VRV Process Step 1-The design

One thing I’ve always been a fan of is a well-developed process. Whether working toward a personal goal and taking the necessary steps to achieve that goal, the process is always the fun part for me. The many steps involved in making a VRV system successful is a process; one where every part of it is extremely important.

In this blog post, I will explain, step by step exactly what it takes to make a VRV system successful, from start to finish, and ultimately, make a VRV system successful for the end users.

The first step in the AirReps VRV process is the design. The design is critical! If the design is off, the equipment will struggle in various fashions, and will ultimately become a detriment to everyone involved.

Below are the “Big 7,” seven factors to look out for when designing a VRV system. There are many nuances to this process and work, and the most important takeaway should be to reach out and work with us at AirReps on every facet of this process. The earlier we are involved, the more we can do to ensure that your specific HVAC needs are filled quickly, efficiently, and in the most cost-effective way possible.

We’re here to help and want all parties to be successful in this process.

 

1. Proper Load Calculation/Block Load Considerations

It’s crucial to conduct an accurate load calculation. This step is the foundation of the design process. The cooling and heating demands of the space must be carefully calculated, considering factors such as building orientation, insulation levels, occupancy, equipment heat load, and local climate conditions as well as a block load calculation.

By using the correct load calculation methods, you can determine the required capacity for the outdoor unit and the number and size of the indoor units. Overestimating or underestimating these values can lead to inefficiency, higher operational costs, and insufficient comfort levels, as well as equipment failures. It’s critical to be as precise as possible with the load calculation, we often see these systems drastically oversized with the assumption that these systems can turn down enough due to them being inverter driven. This assumption can be fatal for the equipment.  

 

2. Indoor Unit Selection

Daikin offers a wide range of indoor units designed for various applications, from ducted to wall-mounted and ceiling-mounted units. Choosing the right type and size of indoor units is essential to achieve optimal air distribution and comfort levels.

Factors to consider when selecting indoor units include room size, aesthetics, airflow direction, and noise levels. For example, larger spaces may require multiple ceiling cassette units for even air distribution, while smaller rooms might be better served with wall-mounted units.

An important factor to key into is the proper placement and usage of any fan coil, ensuring proper clearances for the space that are laid out in the install and engineering manuals.

 

3. Outdoor Unit Sizing

The outdoor unit is the heart of the VRV system, responsible for circulating refrigerant through the system. Sizing the outdoor unit correctly is crucial to ensure efficiency and reliability. An oversized unit can lead to higher upfront costs and reduced energy efficiency, while an undersized unit may struggle to meet the heating and cooling demands of the space. Oversized and undersized equipment can shorten the life span of the equipment.

Ensure that the selected outdoor unit can handle the total load requirements of all connected indoor units, factoring in variations in building load over time.

 

4. Piping Design

Piping is one of the most critical components in a Daikin VRV system, as it connects the indoor units with the outdoor unit. Proper piping design ensures that refrigerant flows efficiently, optimizing system performance and preventing issues like pressure loss or refrigerant leaks. The big thing for these systems is to ensure we can get oil home to the compressor, not having oil traps in the network of piping.

Key considerations for piping design include refrigerant line lengths, pipe diameter, and the number of bends or turns in the piping. Keep in mind that longer piping runs and more complex installations require additional planning to maintain system efficiency.

 

5. Zoning and Control Strategy

One of the major advantages of a Daikin VRV system is its ability to provide zoned climate control, allowing individual temperature control in different areas of a building. Proper zoning is crucial for maximizing energy efficiency and ensuring comfort in each space.

Consider the specific needs of each zone, such as occupancy patterns and usage. Also, determine whether you need a centralized control system or individual remote controllers for each zone.

 

6. Noise Levels and Sound Considerations

Noise can be a significant factor in the design of HVAC systems, especially in environments like offices, hotels, or residential areas. Daikin VRV systems are designed to operate quietly, but proper selection and placement of units can help minimize noise issues.

When selecting indoor and outdoor units, consider the noise levels in both the occupied and external areas, which is incredibly important in terms of user satisfaction.

 

7. Maintenance Access and Serviceability

Lastly, ensuring that the system is easy to maintain, and service is a key consideration in the design phase. Proper access to both indoor and outdoor units, along with clear service routes for technicians, will make routine maintenance tasks like filter cleaning/changing, refrigerant charging, and coil cleaning more straightforward.

Plan for enough space around each unit for ease of access and ensure that the system components can be accessed for troubleshooting.

Your first step when it comes to the VRV process? It should be to reach out to us to begin working together here at AirReps. We’re the experts on this equipment from all ends, from system design to hands-on technical expertise. Our team of experts at AirReps are each dedicating to creating systems that thrive for many decades down the road. It starts at the beginning of the process.

 